As part of the project, we carried out the blasting, crushing, transportation of 1480000 m³ of rocks, and the construction of a cyanide pool with a volume of 45000 m³. As well as the creation of an irrigation system in the area, the installation of a pumping station with a total capacity of 3200 m/3 h., a substation with a capacity of 1600 sq. a. and a cable network. 175000 m² of geocomposite clay solutions and installation of HDPE membranes were performed at the landfill. The quality of the work was fully guaranteed. And the quality of the conducted work was checked by international quality control companies. 

TYPELeaching Project
CLIENTAzerGold CJSC
LOCATIONChovdar/Dashkasan
SIZE175000m2